The GMAT team is making a full QA sweep through the system in preparation for R2013a, our first non-beta release. For policies and procedures for this effort, see R2013a End Game QA Processes.
Schedule
Spec/test complete: November 30, 2012
Doc/wrap-up complete: January 31, 2013
Status Checklists
Use the following tables to track progress.
The feature name is linked to the spec for that feature. There's also a Google Collection![]()
Some old feature specs are located in a GMAT Software Specification
document, and have not yet been moved to their own individual documents.
Basic Dynamics/Models
Team: SPH, WCS, SJH
Name | Issue | Feature Spec1 | System tests | GUI tests | Reference docs | Wrap-up2 |
X | X | X | M | X* | ||
| X | X | X | X | X* | |
X | X | X | X | X* | ||
X | X | X | X | X* | ||
X | X | X | M | X* | ||
X | X | Updating tests | M | X* | ||
FRR-4 Spacecraft Ballistic/Mass | X | X | X | M | X* | |
X | X | X | M | X* | ||
X | X | X | M | X* | ||
| X | X | X | M | X* | |
X | X | X | X | X* | ||
X | X | X | X | X* | ||
X | X | X | M | X* | ||
| X | X | X | X | X* | |
| X | X | X | X | X* |
Powered Flight
Team: DSC, DJC, SJH
Name | Issue | Feature Spec1 | System tests | GUI tests | Reference docs | Wrap-up2 |
FRR-8 Spacecraft FuelTank Model | X | X | X | M | X | |
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X |
Solver Infrastructure
Team: DSC, DJC, SJH
Name | Issue | Feature Spec1 | System tests | GUI tests | Reference docs | Wrap-up2 |
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X | ||
X | X | X | M | X |
Programming Infrastructure
Team: JJKP, WCS, SJH
Name | Issue | Feature Spec1 | System tests | GUI tests | Reference docs | Wrap-up2 |
X | X | X | X | X | ||
X | X |