  • Scrub the system for deprecated features and remove at least low hanging fruit... both code and tests.
    • Save
    • LibCInterface
    • TrackingSystem
    • StatisticsAcceptFilter
    • StatisticsRejectFilter
  • Deprecated Files
    • Xerxes ?
    • ig_rz _origin.dat

    • ap_origin.dat

    • ig_rz_R2016A.dat

    • unused/obsolete NAIF kernels
  • Always build the system and run smoke tests before committing and pushing code.  (This includes when merging code from a branch into another branch.)  This is particularly critical near system freezes (QA Complete, Visual Freeze, and especially Code Freeze.)
  • Check sample missions on all platforms
    • Currently, running samples is assigned to one person.  We should modify the release process to assign it to one person per platform.
  • Seriously consider adding the bundling shell scripts to the daily build script so that we create zip/installer every day and test against those...
  • Include all of the plugin components when running smoke tests and system tests.  We are looking for side effects as well as failures in the component being worked, so we need to watch for those everywhere.
  • Raise and resolve test case failures as early as possible.  The recent issue with Ephem_GMAT_Code500_ACE_OpsPrototype_v13 was thought to be a config issue, but there were other signs of a problem that we neglected.
  • Log the exact Git commit and SVN revision used for daily builds and regression tests. It can be difficult to determine where in the commit graph the branch used for the build is, especially when multiple branches are being developed in parallel.
  • Some pushes to the central repository will not compile.  That makes it difficult to track down when a change occurred.  It would be useful to include a note on the commit message stating that the code does not compile, and why.
  • We should run Console version on Windows and GUI version on Mac at Feature Complete to identify any problems; then we can fix issues by QA complete.
  • Similarly, we should update data files at Feature Complete so that we can debug by QA complete.
  • The Console/Windows, GUI/Mac, and data file updates should be repeated when testing RC0.
  • We need to consider what is a realistic approach to updating User Guide.
  • We need to look at rundef/startup file conflicts and how to avoid them; for example turning alpha plugins off in rundef can hide error of not turning them off in startup file.
  • We should track tickets by release and sprint, not just sprint.
  • We should default to putting the current release in the “Fix Version” field in JIRA, and remove it later if the work is to be deferred.
  • We should define Rnnnnx-Sprint-Final as the time between Feature Complete and Code Freeze; and number all sprints before Feature Complete
  • We should have defined terminology for what should go in the “Fix Version” field for JIRA; all tickets should have one of the standard values. A notional set for discussion:
    • CCB incoming – new tickets for CCB disposition
    • Rnnnnx – assigned to a release
    • Near Term backlog – needs to go in next release
    • Long Term backlog – needs to go in some future release (I’ve seen “someday” in the Fix Version field, this is equivalent
    • Backlog – tickets to review to see if they are overtaken by events or should be put in some other category.

Stop Doing